from
an empty designated service cylinder to a reserve cylinder, without interruption of service. It features a green indicator dome which changes to red when the service
cylinder needs to be refilled.
Specifications
• Excess Flow
• Zinc Die Cast
• Molded Rubber Diaphragms
• CSA Listed to U.L. 144
• 2nd Stage Relief Mechanism Per U.L. 144
• Powder Coated
BTU capacity service: 262,500 BTU/HR* propane, 1/4 F. INV. flare, 3/8 FPT 6-1/4" high