Product Description
General
2P/3P/4P 230VAC 63A/100A/125A works with L+N 220-230V 50-60Hz. WIFI smart dual power automatic transfer switch
Generator/PV to city power
Manual Switching /Automatic Switching / tuya WIFI Switching
You can freely choose among three switching modes.
【Product parameters】: Rated current: 100A; Rated insulation voltage: 690V; Rated voltage: AC 220V; Rated frequency: 50/60Hz; Rated short-circuit current: 5KA; Mechanical life: ≥8000 times; Electrical life: ≥1500 times.
【High quality and durability】: Made of high-quality PA6 material, it has excellent heat resistance and insulation performance. Flame retardant grade 94V-2; Compact and sturdy, mechanical life: ≥8000 times, electrical life: ≥1500 times.
【Quick switching】: In automatic mode, when the main power source I fails, GEYA ATS can automatically switch to backup power source II within 50 milliseconds to ensure stable and normal power supply in the store and reduce power outage-related electricity problems.
【Wide application】: This ATS Dual Power Auto Transfer Switch can ensure stable power supply. It is suitable for various equipment and scenarios that require stable power supply. It is widely used in hospitals, data centers, airports, fire departments, and other scenarios.
We will process your order within 1 business day upon payment except holidays and weekends. Once I update tracking number, orders can not be canceled.
Economy shipping:
all economy shipping parcels do not come with tracking information or only provide tracking information when parcels are in China. If you haven't recieved your parcels after wait a long time, please contact your local post office to check your parcel by providing your recipient's name and mobile phone number.
Standard shipping:
standard shipping parcels provide whole tracking information. Suggested!
Expedited shipping:
DHL is the default. UPS or FEDEX can be choosen as well.(when you bought relays more than 35 PCS,we will upgrade your shipping to Expedited shipping by free!)
If you have any requirements about expedited shipping service, please contact me free.
When you submit a return or refund application, please
1. Provide a detailed problem description and photos so that we can deal with it as soon as possible.
2. Please obey my requirments about packing of return goods. After warehouse staff recieve and check your parcel is ok, then I will refund you.
In the past 10 years, Geya has been focusing in low voltage electrical and automation control items research, development and production. We have more than ten years of production experience and have CE, CB and other international certifications. Customization service is also provide.