*AVOID LISTING PRICE, READ BELOW FOR PRICING*
Ready-to-finish natural-gas Bitcoin mining site in Eastern KY.
All infrastructure is built and running up to the generators — just needs servicing to go live.
✅ 4–5 MW natural-gas potential on site (1MMCFD)
✅ 34 × Antminer S19 (22 110TH and 12 120TH) ≈ 3.8 PH/s
✅ 2 natural-gas gensets (~200 kW total) Kohler 135RZD and a Onan 75KW.
✅ 600KW 20-ft container wired with PDUs
✅ Starlink internet and gas connection already set up
🔧 Needs service: Varitech Inc. quoted $3,500 to repair the ECM on the Kohler 135RZD
After that, it’s plug-and-play.
💰 Potential Revenue (Oct 2025 BTC price/difficulty):
115 kW currently = ~$3K/mo gross
300 kW = ~$8K/mo gross
Full container buildout = ~$15K–$17.5K /mo gross
⚡ Power Cost Equivalent: ≈ $0.035–$0.045 per kWh (NYMEX daily gas futures price + 2 dollars per MMBTU)
💵 Two Ways to Buy:
$60K – Equipment only (miners + PDUs + container + generators)
$95K – Turnkey site with gas feed + generators + infrastructure
📜 NCNDA or purchase required before revealing site location and gas supplier.
Reason for sale: Service Techs are scarce in the local area. Owner expanding to a 10 MW on-grid site.
Serious buyers only – ready to go project with massive upside. AS-IS sale. Wire transfer or cash only.
Optional Kohler 200RZD under 1000 hours for an additional $8000, bringing total KW to 400KW
Message on eBay or call 8xx5xx9xx-9xx4xx0xx-8xx0xx2xx2xx for inquiries (look between the x's for the number)