Description :
Use the steel wire rope with a size of less than or equal to 0.4mm to vertically pass through the middle hole position from top to bottom for installation, and tie a knot at the top and bottom after the installation is completed for fixation, which is suitable for application in scenarios such as shaft measurement
With soft bag.
Quantity: 1PC
High Quality And Brand New