High-Power Handheld Electric Threading Machine for Pipe Tapping and Tapping Wrenches
Operating Instructions: 1. Select the appropriate die head, straighten the retaining ring, and install it on the main unit from the right side. 2. Align and clamp the pipe securely; the length of the pipe should be approximately equal to the length of the lever arm (L2 should be approximately equal to L1). 3. Set the forward/reverse switch to the downward arrow position, then activate the start switch and auxiliary contact. 4. When clamping hard pipes such as galvanized or copper pipes, apply lubricant promptly; plastic pipes do not require lubrication. 5. Ensure the pipe clamp does not come into contact with the main unit while moving to the right, as this may damage the main unit. 6. Once the machine has stabilized, move the reverse switch to the upward arrow position to release the pipe.