Since the beginning of production of the new Soviet car GA3-51, a number of improvements have been made in the design of the car on the basis of the operating experience. For example, a more perfect carburettor K-49A instead of K-49, a standard filter element ASF0-2, a new, more perfect cylindrical bearing of the driving pinion of the main gear, a distributor with a device facilitating the ignition setting depending on the detonation properties of the fuel, etc. were installed.
This manual reflects all the changes made to the design of the car for the period 1946-1949.
In the post-war Stalin's Five-Year Plan, the automobile industry developed tremendously - the production capacity of existing automobile plants increased, as well as the construction of new large plants. In this connection the production of automobiles increased sharply and in 1950 it should reach 500 thousand cars per year, of which a significant part will be made up of trucks and cars of new designs.
Modern domestic automobile production clearly demonstrates the advantages of Soviet automobile technology over foreign ones. In the years of the Great Patriotic War our automobile plants started designing and preparing for the production of new cars and trucks. Soon after the end of the war, the Soviet industry started to produce ZIS-110, M-20, ‘Pobeda’, ‘Moskvich’, ‘Pobeda’ and ‘Moskvich’ cars.
‘Pobeda’, “Moskvich”, GAZ-51, GA3-63, GAZ-63A, ZIS-150, ZIS-151, ZIS-154, ZIS-155, YaA3-200, etc., satisfying the most diverse requirements of the Soviet industry.
 


Shipping worldwide (via Internaional AIRMAIL with tracking number)

Shipping Time:

I ship your orders within 1-2 business days after the payment cleared.

 In most times item will reach most of the countries within 15 to 25 working days. To some remote areas may take more than 25 working days.

Delivery time depends on destination and other factors, it may takes up to 20 working days. If you don't receive the item after 30 days,

please contact us, we'll investigate and solve the delivery problem. To some remote areas may take more than 45 days!

I * LL ALWAYS COMBINE SHIPPING WHEN POSSIBLE.

FEEDBACK:

Please do not forget to leave Feedback. The feedback will be left after reception

 of a feedback from you. If you had a problem with got item, communicate

with me before to leave a negative feedback. I will try to solve a problem.

Your positive feedback is very important for me.