Item is used but in excellent condition. Has been tested and is  fully functional.




Minimum Relay Operations: 100,000 @ Full Load


Main Power Requirements :

The main power source must be supplied for the lights to function.

8 Outlets Light Controller, Use only a 50A, 2-pole circuit breaker and #6 AWG wire to provide the main power.

Proper connection of the ground wire to the ground lug is critical for safe operation.

The Light Controller with universal 120/240V receptacles can be used to operate 120V devices ONLY IF the main power is also wired in at 120V.

Installation Notice:

DO NOT connect ballasts to the Light Controller until AFTER the main power has been properly installed.

Verify trigger cable is disconnected from the external timer or controller.

Connect ballast power cables to the receptacles on the Light Controller.

Connect the trigger cable to the external timer or controller.