|
PPR Shut-Off Valve Disassembly Steps
1. Prepare the tools you need to use
2.Unscrew the screws with a screwdriver. 3.Unscrew the spool with multi-function spanner. 4.Dismantling completed |
|
|
PPR Hot Melt Steps Explained
1. Prepare the necessary tools (pipes, fittings, hot melt, mould head, pipe scissors, big head pen).
2.Check whether the mould head is complete, and fix the mould head on the heating plate with screws. 3. Plug the hot melt device into the power supply modulation 260 ° heating for five minutes can be used (do not use hand to contact the die head or heating plate, very hot) 4. Use scissors to cut out the required length of pipe vertically, to keep the break flat and not tilted, and pipe and fittings fusion of dust, dirt removal 5. Mark the insertion depth of the pipe (equal to the socket depth of the joint). 6. Heat the pipe and fittings throughout the insertion depth, on the heat fusion device 7. After the heating is completed, push the pipe fittings smoothly and evenly into the joints, and keep them cool. 8.Fusion |
|