KATO 10-2050 N Gauge JR E8 Series Yamagata Shinkansen “Tsubasa” 7-Car Set Japan

Description

Brand New

〇 JR East Yamagata Shinkansen E8 Series G2 formation, 7-car set
〇 Features the distinctive “Arrow Line” nose design with headlights positioned on both shoulders
〇 Beautifully finished body colors inspired by Yamagata Prefecture symbols:
 – Oshidori Purple (Mandarin Duck)
 – Benibana Yellow (Safflower)
 – Zao Bianco White
〇 Pantograph cover accurately reproduced with fins only on the arm mounting side
〇 Headlights and taillights illuminate; Car No.11 (E811) equipped with on/off light switch
〇 Headlights use granular LED array, taillights reproduced with six lights above the cab
〇 Equipped with a slotless motor for smooth and quiet operation
〇 Designed for coupling with JR E5 Series; no traction tires
〇 Front coupling mechanism installed on Car No.11 (E811) for realistic E8 + E5 combined operation
〇 Side destination displays printed in black; destination sticker sheet included
〇 Basic set uses KATO’s “Best Selection” beginner-friendly package
〇 Includes small rerailer with the 7-car set
〇 Book case of the add-on set can store the contents of the basic set

🚄 Prototype Information

〇 JR East E8 Series entered service in March 2024 as the newest Yamagata Shinkansen rolling stock
〇 Based on the E6 Series, developed under the concept “A train that weaves together rich land and heart”
〇 Enhanced facilities including large luggage spaces in all cars and expanded wheelchair areas
〇 Operates coupled with E5 Series “Yamabiko” between Tokyo and Fukushima
〇 Maximum operating speed: 300 km/h

📦 Included Accessories

〇 Destination display sticker sheet
〇 Screwdriver for light switch
〇 Small rerailer

🔧 Optional Parts (Sold Separately)

〇 11-211 / 11-212 LED Interior Lighting Clear (6 cars)
〇 11-213 LED Interior Lighting Clear (Warm White) for Green Car (E811)

📐 Specifications

〇 Scale: 1/160 (N Gauge)
〇 Track Gauge: 9mm (N Gauge)
〇 Number of Cars: 7
〇 Power: Motorized
〇 Recommended Age: 8 years and up
〇 Operator: JR East
〇 Region: Tohoku / Greater Tokyo Area
〇 Service Period: 2024 – Present
Provided by HARU