Product Installation
Installation of the main unit: The main unit is installed in the driver's cab, and should be installed in a stable and solid position.
Installation Give full consideration to the length of the power cable and the vibration of the tower crane to ensure that the mainframe can not be loosened during use.
The main unit cannot be loosened in the process of using.
Sensor Installation: The sensor of anemometer is installed above the cab.
The sensor of the anemometer is mounted on the top of the cab, and the mounting position should be level, and it can't fall off during the work of the tower crane.
Remarks: 0* shielded cable is attached to connect with the main machine.
How to use/
Tower head inserted into the 220V socket, the alarm light flashes, this is the self-test process, until the 4 window
port numbers are stable, that is, the working state.
Press the setup button once, set the fan +0.5 level, 3-10 level cycle settings, when the wind
When the wind speed is greater than the set level, the device is in alarm state, the buzzer sound alarm, the alarm window has a red light flashing.
The alarm window has red light flashing. At the same time, the internal relay status is flipped. Normally open
to short circuit and normally closed to open circuit.
This function is an extension function, which can be installed by customers. (such as: power failure
Sound and light alarm etc.)