Installation Procedure
-
Install the switch between the controller and the battery.
-
Install a switch between the controller and the PV module.
-
Check that the "+" and "-" of the PV module and the "+" and "-" of the battery are correctly connected.
-
Turn on the battery switch first, then turn on the PV switch.
|
LCD display
-
ESC: Exit the setting without saving the data.
-
UP: Scroll down, adjust the parameter by increasing the value.
-
DOWN: Scroll up, adjust the parameter by decreasing the value.
-
ENTER: Short press to move to the next setting page, long press to exit the setting and save the data.
|
Display Code Meaning
Display Code Meaning
-
EQU: Load voltage compensation
-
BST: Pulse charging voltage
-
FLD: Load voltage hold
-
LDV: Over-discharge voltage
-
LRV: Over-discharge recovery voltage
-
BST - r: Pulse charge recovery voltage
-
Battery type: FLD/SEL/Gel/Lithium/Use
|