We are selling through multiple channels and may have more availabilities on our "i5 Electric Supply" (i5electric) official site. So, if you need more quantity or other similar items not available here.  You may be able to find it from our other channels.

This is brand new Square D MP64-200 600A Bus 4 ring type meter sockets 200A each. Overhead/Underground and meets EUSERC standards. 

This MP meter center has four ringed meter sockets with no bypass and a 4 jaw socket. This main lugs unit can be feed from an overhead or underground service. The aluminum main bus ampacity is 600 A. The maximum tenant main lugs amperage is 200 A with a 240 VAC 3 wire single phase maximum. This unit has a NEMA 3R surface mounting enclosure that is 52.00 inches tall, 29.44 inches wide and 8.28 inches deep. This meter center with accept one 1/0 AWG to 600 kcmil or two 1/0 AWG to 250 kcmil copper or aluminum wire. This MP meter center unit is UL Listed.


Note: 

1. Though this is a brand-new item, and, we will add additional carton outside its original manufactory's carton packing. Due to its heavy weight and potential long transportation.  Some minor cosmetic imperfections might occur, such as minor scratches, tiny paint offs etc.  By ordering this item, you agree to accept those potential minor cosmetic imperfections if any, in which will not affect to its operational functionalities.

2. Item will be shipped with insurance and signature required. Please make sure someone will be at destination address to exam and sign the package.

3. If you are not sure, please consult serving utility for their requirements prior to ordering and installing, as specifications and approvals vary by utility and may require local electrical inspector approval. All installations must comply with all national and local codes, laws and regulations. It's your own responsibility to confirm those with your authorities. By ordering this item, you acknowledge that you already done your due diligence, fully understand installation requirements, confirmed with power/utility company and inspector for their approvals or fully understand the risks if you haven't done that yet and willing to take risk on your own.