The process is as follows: starting temperature 700℃, heating rate 60℃/min, die casting temperature 915-930℃, heat preservation time 10-30 minutes; vacuum (vacuum value 5 bar) is required during 700-930℃; natural cooling below 300℃.The semi-finished products are processed into finished products by other processes and then used by specialists for human dentures or tooth restoration.