New Enphase ECWP-01-06 AC interconnection transition cable allows you to connect your Enphase M190 or M210 solar Grid-Tie Micro Inverter string to the AC grid connection transition box.
The cable is 6 feet in Length. One end of the cable twists and locks onto the first inverter trunk cable of the inverter string. The other end of the cable has stripped wires that connect to your location's AC grid power connection box.
The cable accommodates both (either) 208 AC three phase service or the more common 240 AC single phase split service (L3 wire is not used in 240VAC configuration).
Sealed in Enphase OEM bag with installation instructions.