Description
NEW APC AP8981 Metered Switched Rack PDU 2G ZeroU Masterswitch FREE 24H TRACKED
UK STOCK
APC Switched Rack PDU , Input: 400V 3PH , Input Connections: IEC 309 16A 3P+N+PE, IEC 309 20A 3P+N+E , Cord Length: 6 feet ( 1.83 meters ) , Output: 208V, 230V , Output Connections: IEC 320 C13,IEC 320 C19. Includes: Installation guide, Rack Mounting brackets, Safety guide, Sample locking IEC power cord, Serial configuration cable.
Design
PDU types Metered, Switched
Product colour Black
Rack capacity 0U
Ports & interfaces
AC outlets quantity 24 AC outlet(s)
Output connections (21) IEC 320 C13, (3) IEC 320 C19
Input connection type IEC 309 16A 3P+N+PE, IEC 309 20A 3P+N+E
Features
Cable length 1.83 m
Ergonomics
Cable length 1.83 m
Power
Nominal input voltage 400 V
Maximum total current draw per phase 20 A
Maximum input current per phase 20 A
AC input frequency 50 – 60 Hz
Weight & dimensions
Dimensions (WxDxH) 56 x 46 x 1791 mm
Weight 7 kg
Package weight 8.95 kg
Package dimensions (WxDxH) 165 x 114 x 2002 mm
Packaging data
Package weight 8.95 kg
Package dimensions (WxDxH) 165 x 114 x 2002 mm
Operational conditions
Operating temperature (T-T) -25 – 65 °C
Storage temperature (T-T) -5 – 45 °C
Storage relative humidity (H-H) 5 – 95%
Operating relative humidity (H-H) 5 – 95%
These have a 3-phase input plug - lots of people just have single phase. It is possible to use a plug adapter to supply all 3 phases in this unit from your single-phase feed using something like an IEC309-32A 1-phase commando plug. Email if you need this.
As these are master switches, you can turn off / on individual sockets on the PDU strip via the web interface. We reset this interface to the default (apc/apc) username and password, and to handshake with a DHCP server for an IP address on your network. You can configure the start-up sequence (stagger the inrush current) and load shed to give priority to the most critical devices.
The total device current and individual current per phase can be seen on the web page. You can configure alerts, and these Generation 2 devices can have a load-shedding policy on overload.
There is an LCD interface on the PDU that can give basic info and status of the device + load.
MFR text :
<<Avoid circuit overload during power recovery and extend the uptime of critical equipment by prioritizing the load shedding. Current metering provides real-time remote monitoring of connected loads. Switched Rack PDUs include real power monitoring, a temperature/humidity sensor port, locking IEC receptacles, and low-profile circuit breakers. User-defined alarms warn of potential circuit overloads before critical IT failures occur.>>
All of our consignments are sent fully insured on a 24 hour service with our carriers. We cover all problems that occur in transit. We can ship to the EU (transit time varies) and have experience packing and shipping to overseas destinations. The EU shipping costs are estimated only, please contact us for confirmation before ordering. Large UPS may be palletised or shipped with the UPS in one box, and the cells in another. We have the packing materials to make sure that there are few problems in transit.
Specifications
Main Input Voltage: 400 V 3 phases
PDU type: Switched
Main Output Voltage: 208 V - 230 V
Input Connection Type: IEC 60309 16 A 3P + N + PE (5 pin round red commando)
Output sockets (per phase) 7x IEC13/14 1x IEC19/20 type
Total output sockets
21x IEC13/15
3x IEC19/20
Cable length: 1.83 m
Colour: Black
Height: 179.1 cm
Width: 5.6 cm
Depth: 4.6 cm
Net weight: 7 kg