Welcome to our store!
To avoid you buying the wrong parts, DO CHECK the compatible chart above before placing order.
-
Choose a vehicle from the "My Garage" list. Or
-
Enter your vehicle's details with Year / Make / Model / Trim / Engine. Or
-
Contact us: Ask us for double check.
Fitment:
Nissan Rogue 2008-2013
Nissan Rogue Select 2014-2015
CV Axle Installation Instructions:
Pre-Installation Preparation
- Tool Compatibility: Prepare a torque wrench (recommended range: 50-200N·m), ball joint separator, circlip pliers, socket set, and rubber mallet. Ensure the tool specifications match the vehicle's bolts.
- Part Inspection: Verify that the CV axle model matches the vehicle's VIN code. Check for no shaft bending, intact and leak-free boot, undamaged constant velocity joint raceways, and normal circlip elasticity.
- Vehicle Preparation: Park the vehicle on a level surface, engage the parking brake and secure the wheels, lift the vehicle to a safe height (recommended: over 30cm above the ground), and remove the wheel on the side to be replaced.
Installation Steps
- Remove the old axle: Disconnect the fixing bolts between the half-shaft and the transmission, separate the steering knuckle from the lower control arm ball joint using a ball joint separator, and gently tap the flange end of the half-shaft to remove the old axle (avoid impacting the transmission output shaft).
- Cleaning and Pre-treatment: Clean the splines of the transmission output shaft and the contact surface of the steering knuckle bearing housing to remove oil, grease, and rust. Apply a small amount of lithium-based grease (follow the manufacturer's instructions for whether to apply it to the transmission end).
- Install the new axle: Align the splined end of the new CV axle with the transmission output shaft, push it steadily until the circlip fully locks into place (a clear "click" sound is heard). Ensure the flange surface fits closely with the steering knuckle, and tighten the fixing bolts to the specified torque (reference value: 80-120N·m; refer to the vehicle's service manual for exact specifications).
- Reassembly and Inspection: Reconnect the lower control arm ball joint and tighten the lock nut. Install the wheel (tighten the wheel bolts evenly in a diagonal pattern, torque reference: 90-110N·m) and lower the vehicle.
Usage Precautions
- First startup after installation: Idle the engine for 30 seconds, check for transmission leaks, and turn the steering wheel to test for smooth operation without jamming or abnormal noise.
- Driving Restrictions: Avoid sudden acceleration, hard braking, and high-speed cornering within the initial 500km. Resume normal driving after the components are fully broken-in.
- Abnormal Condition Handling: If vibration, abnormal noise (especially during cornering), or oil leakage occurs while driving, stop the vehicle immediately for inspection to prevent damage to the transmission or suspension system.
Notice:
Please check the model and important parameters before purchase to avoid unnecessary after-sales problems, if you are not clear, please feel free to contact us, thank you for your cooperation!
| Item Specifics |
|---|
| UPC | Does not apply |
| Brand | VaultPro |
| Manufacturer Part Number | 13487229 |
| Manufacturer Warranty | 1 Year |
| Quantity | 1 |
| Fitment Type | Direct Replacement |
| Part Type | CV Axle Assembly,CV Axle Shaft |
| Surface Finish | Painted |
| Non-Domestic Product | No |
| Weight | 12LB |
| Bundle Listing | No |
| Material | steel |
| Other Part Number | 39600JD60A |
| Superseded Part Number | 66-6352 NCV53020 |
| Mounting Hardware Included | No |
| Input Shaft Connection Style | Spline |
| Number of Inboard Splines | 21 |
| Output Shaft Connection Style | Spline |
| Output Shaft Spline Count | 25 |
| Drive Type | AWD |
| ABS Ring Included | Yes |
| ABS Ring Tooth Count | 48 |
| Axle Nut Locking Type | Castle |
| Spindle Nut Included | Yes |
| Modified Item | NO |
| Vintage Part | NO |
| Universal Part | NO |
About Us:
We are committed to making the best auto-parts products and providing you with better services.
So if you have any quesiton or problem, please fell free to contact us about that.
Payment:
Any payment can be accepted by ebay.
Shipping:
2-8 working days in transit.
Product will be shipped within 2 business days after full payment is received and verified.
USPS, UPS, FedEx shipping will be provided.
Delivery time is about 2-8 business days to most of addresses.
Returns:
30-day free return provided.
Contact Us:
Any quesiton or problem, do contact us please.
We are always online to answer.
Note: Do check the compatible chart before paying the items, or contact us for checking the compatibilities for your vehicles/cars/trucks.