With over 750,000 snap ties sold, Sandbaggy is trusted by concrete contractors nationwide. These long end snap ties are designed for 6" wall forming systems, rated at 2,250 lbs (2:1 safety factor) for dependable performance and proper wall alignment during demanding pours.
Built from construction-grade steel with integral heads and 1" plastic cones for clean break-back and rust prevention, these ties are designed for strength and repeat use.
Backed by our 1-Year Ironclad Warranty — built tough and protected against manufacturing defects under normal use.
Snap ties are an essential component in formwork for concrete, connecting two distinct surfaces. Made of either plastic or steel, these ties feature a cone-shaped head at one end and a threaded rod on the other. The Jahn A bracket then holds the snap tie in place and also supports the wale or stud.
Snap ties are installed by threading them through form holes, then secured by tightening with a snap tie wedge. This spreads the plastic cones out, locking the forms in place. Once concrete cures, the wedges are removed and cones broken off, freeing the ties from the concrete.
Most snap ties have a minimum working load of 2,000 lbs, capable of withstanding the pressure of up to 2,000 lbs of concrete.
Snap ties can be sealed with silicone caulk, hydraulic cement, or similar materials for better protection against water seepage into concrete.
Snap ties can withstand 2,000 lbs of concrete pressure, depending on size and material.
Short end snap ties have shorter threads on the end of the ties, while long end snap ties have longer threads. The length required at the end of the snap ties will depend on your forming system type.